Showing posts with label attachment. Show all posts
Showing posts with label attachment. Show all posts

Thursday, February 2, 2012

industrial attachment: viva

the viva will be conducted on the first day of the semester, which is 
7/2/2012, tuesday.
please click the link below to know the time for your viva session.
VIVA TIMETABLE


there will be 3 different venues so 3 students will be vivaed at the same time.
please be informed.


thank you.



p/s-venue belum tahu lagi. anything will be updated okay.




posted by,
ex-acr

Tuesday, January 3, 2012

industrial attachment: viva

viva akan dibuat pada hari pertama semester depan.

-dr. ju-

tq.

Wednesday, December 7, 2011

PT: tajuk kes hosp attachment minggu lepas

GROUP A
A1
Unstable angina with underlying COPD
A2
COAD secondary to CAP
A3
AEBA secondary to CAP
A4
Acute pulmonary edema secondary to ACS (NSTEMI) & acute on CKD
A5
Hepatitis secondary to anti-TB medicines
A6
Upper GI bleeding
A7
 NSTEMI with hemorrhagic stroke
A8
Decompensated CCF secondary to fluid overload
GROUP B
B1
AECOPD secondary to CAP & respiratory failure type 5
B2
AECOPD secondary to CAP
B3
COPD
B4
ESRF
B5
Young HPT secondary to renal pathology (surgical case)
B6
ACS with NSAID induced gastritis
B7
UA, CCF and uncontrolled HTN
B8
Underlying HTN and IHD
GROUP D
D1
HAP with underlying lupus nephritis
D2
ESRF with traumatic tenckhoff insertion
D3
Advanced ascites secondary to chronic hepatitis with esophageal varices
D4
UA
D5
UA with CKD, DM & HPT
D6
Acute coronary syndrome
D7
AEBA secondary to URTI
D8
AECOAD secondary to infective bronchiectasis secondary to HAP


kepada yang berkenaan, sila check.
kalau ada yang silap, sila bagitahu cepat-cepat ye.
btw, ini hanya melibatkan group yang ke hosp pada minggu lepas je. 
group C duduk diam-diam, tak perlu check apa-apa :p


tq. 

Wednesday, November 16, 2011

industrial attachment: viva

viva untuk industrial attachment akan dibuat 
waktu dah nak dekat dengan revision period nanti, 
which means it won't be done dalam masa terdekat ni 
since all of us are busy with assignments and stuffs. 

source: mdm juliana


p/s: the exact date will be informed later. 
tq. 

Tuesday, October 25, 2011

updated - Transportation PT/CP

bas ke kemaman & temerloh hari khamis ni
pukul 6.30 pagi
tunggu kat CF sister


untuk kegunaan group leader:
driver ke kemaman: en. mustafa [019-9169261]
driver ke temerloh: en. fadhil [014-8133346]



.sekian.

Wednesday, October 19, 2011

Transportation PT/CP

group C (Temerloh)
naik bas pukul 6.15 pagi di CF sister.


group D (Kemaman)
naik bas pukul 6.30 pagi di CF sister. 


sila jangan lewat.
tq. 



Wednesday, October 12, 2011

Transportation PT/CP

 Esok

>Bus ke Temerloh kul 6.15am kat KOP
>Bus ke Kemaman kul 6.45am kat CF sister

jangan lewat ye....

Tuesday, October 11, 2011

PT attachment

jadual attachment
klik untuk lebih jelas


in case ada yang tertanya-tanya, borang mana yang kita patut guna masa attachment nanti (sama ada borang original MOH atau borang yang dr. zainol buat),  sr. azrin cakap boleh guna mana-mana pun, provided that you do not miss any important info. 
boleh refer pada section 'format of case report' kat kertas yang dapat sorang satu tu kalau nak tahu maklumat apa yang perlu ada.


terima kasih. 

Saturday, October 8, 2011

executive report

FORMAT CONTAINS:
Name + Matric Number
Each Segment (S1; S2 and S3)
Address of Pharmacy (postal + P I/C)
Dates of attachment
Summary (own view/version on the segment)
submission: latest on 14 october

p/s: sesiapa yang dah siap report (HMR/community attachment) dan nak hantar, boleh hantar direct kepada madam rohani dalam kelas hari selasa ni.

Saturday, May 28, 2011

just sharing #community att & HMR

question:


salam. madam, i would like to ask you questions about the attachment and HMR. 


1. for the inventory control part, it's stated there - storage requirements regarding rotation, security...
i don't really understand what do you mean by 'rotation' here. i mean, what does rotation refer to with regard to storage requirement? 

2. is it okay of we bind the community attachment report together with the HMR report? or do you want us to make them separate? 

thank you,


answer:



TQ for your e.mail.

"Rotation' is in relation to the stock turn-over according to the pharmacy inventory.

as for HMR, I hope to receive separately from the manual.

TQ
Regards
Hjh



p/s - feel free to share whatever you know okay.  tq.  =D

Friday, April 15, 2011

softcopy: community posting , briefing, and everyhting in between.


Siapa lg yg tak ambik lg softcopy utk briefing pg td.Kamu semua boleh pastekan links di bawah.dan download.



Have a nice friday
Thanks.




Sunday, January 16, 2011

Clinical Pharmacy II: Hospital Attachment


-semoga berjaya-

Muhammad Syakirin Bin Zaini
Ketua Kelas Sem II 2010/2011